Economics of Power Generation
Which plant can never have 100 percent load factor?
Peak load plant
Nuclear power plant
Base load plant
Hydroelectric plant
Peak load plant
Nuclear power plant
Base load plant
Hydroelectric plant
Answer
Download EE MCQ app
Related Question
Economics of Power Generation
Maximum demand tariff is generally not applied to domestic consumers because
Their load factor is low
Their maximum demand is low
They consume less power
None of the listed here
Their load factor is low
Their maximum demand is low
They consume less power
None of the listed here
Answer
Download EE MCQ app
Economics of Power Generation
Salvage value of the plant is always
Zero
Any of the listed here
Positive
Negative
Zero
Any of the listed here
Positive
Negative
Answer
Download EE MCQ app
Economics of Power Generation
The connected load of a domestic consumer is around
80 kW
5 kW
40 kW
120 kW
80 kW
5 kW
40 kW
120 kW
Answer
Download EE MCQ app
Economics of Power Generation
Diversity factor has dirrect effect on the
Running cost of unit generated
Fixed cost of unit generated
Both fixed and running cost of unit generated
None of the listed here
Running cost of unit generated
Fixed cost of unit generated
Both fixed and running cost of unit generated
None of the listed here
Answer
Download EE MCQ app
Economics of Power Generation
Annual depreciation of the plant it proportional to the earning capacity of the plant vide
None of these
sinking fund depreciation
reducing balances depreciation
straight line depreciation
None of these
sinking fund depreciation
reducing balances depreciation
straight line depreciation
Answer