Economics of Power Generation
When the plant restors to load shedding it can be conclucted that
Peak demand is more than the installed capacity
Diversity factor is zero
Plant is under repairs
Daily load factor is unity
Peak demand is more than the installed capacity
Diversity factor is zero
Plant is under repairs
Daily load factor is unity
Answer
Download EE MCQ app
Related Question
Economics of Power Generation
The connected load of a IVMIM uir consumer is around
80 kW
120 kW
40 kV
5 kW
80 kW
120 kW
40 kV
5 kW
Answer
Download EE MCQ app
Economics of Power Generation
When the power factor of generating station is improved, the cost per unit
Remains same
Increases
Decreases
None of the listed here
Remains same
Increases
Decreases
None of the listed here
Answer
Download EE MCQ app
Economics of Power Generation
For a consumer most economical power factor is generally
0.5 lagging
0.95 lagging
0.5 leading
0.95 leading
0.5 lagging
0.95 lagging
0.5 leading
0.95 leading
Answer
Download EE MCQ app
Economics of Power Generation
Which of the following is not a method for estimating depreciation charges?
Straight line method
Diminishing value method
Sinking fund method
Halsey
Straight line method
Diminishing value method
Sinking fund method
Halsey
Answer
Download EE MCQ app
Economics of Power Generation
Most of the loads are
Capacitive
None of the listed
Inductive
Resistive
Capacitive
None of the listed
Inductive
Resistive
Answer
Download EE MCQ app