Economics of Power Generation
When power factor is improved, the lagging kVAR drawn from the supply will
None of the listed here
Remains same
Decrease
Increase
None of the listed here
Remains same
Decrease
Increase
Answer
Download EE MCQ app
Related Question
Economics of Power Generation
The annual deposit is _____ in sinking fund method as compared to straight line method.
The same
Greater
Smaller
None of the listed here
The same
Greater
Smaller
None of the listed here
Answer
Download EE MCQ app
Economics of Power Generation
When the power factor improved, the kW capacity of alternator is
Decreased
Unaffected
None of the listed here
Increased
Decreased
Unaffected
None of the listed here
Increased
Answer
Download EE MCQ app
Economics of Power Generation
The expected useful life of an hydroelectric power station is around
15 years
100 years
60 years
30 years
15 years
100 years
60 years
30 years
Answer
Download EE MCQ app
Economics of Power Generation
Large capacity generators are invariably
Hydrogen cooled
Water cooled
Natural air cooled
Forced air cooled
Hydrogen cooled
Water cooled
Natural air cooled
Forced air cooled
Answer
Download EE MCQ app
Economics of Power Generation
A consumer who consumes more electrical energy should pay
None of the listed here
Less fixed charges per unit
More fixed charges per unit
Less running charges per unit
None of the listed here
Less fixed charges per unit
More fixed charges per unit
Less running charges per unit
Answer