The number of pilot wires required for protecting 3-phase transmission lines using Translay System of protection is
6
3
2
4
6
3
2
4
Answer
Download EE MCQ app
Related Question
GETCO Exam Paper (30-11-2008)
Select the most suitable word from the given choices to fill in the blanks to make the sentence meaningfully complete
In the camps volunteers served one and all without _____
discrimination
distinction
considertion
discretion
discrimination
distinction
considertion
discretion
Answer
Download EE MCQ app
GETCO Exam Paper (30-11-2008)
Burden of the relay is _____ rating of relay
current
watt
voltage
volt-amp.
current
watt
voltage
volt-amp.
Answer
Download EE MCQ app
GETCO Exam Paper (30-11-2008)
Steady - state stability limit of a power system means that the system is capable of maintaining
the frequency at 50 Hz exactly
All of these
a constant power flow throughout
synchronism between machines and on external tie lines
the frequency at 50 Hz exactly
All of these
a constant power flow throughout
synchronism between machines and on external tie lines
Answer
Download EE MCQ app
GETCO Exam Paper (30-11-2008)
Rewirable fuse has _____ time-current characteristic
linear
square
none of these
inverse
linear
square
none of these
inverse
Answer
Download EE MCQ app
GETCO Exam Paper (30-11-2008)
The symmetrical components are used in fault analysis because
the result are in terms of symmetrical components
the sequence networks do not have mutual couplings
none of these
the number of equations become lesser
the result are in terms of symmetrical components
the sequence networks do not have mutual couplings
none of these
the number of equations become lesser
Answer
Download EE MCQ app
Search
Login here
Google
Download our application
Android
Apple
Follow Us
Facebook
Telegram
Instagram