Economics of Power Generation
The expected useful life of an hydroelectric power station is around
15 years
100 years
30 years
60 years
15 years
100 years
30 years
60 years
Answer
Download EE MCQ app
Related Question
Economics of Power Generation
Which of the following is the disadvantage due to low power factor ?
High cost of equipment for a given load
Poor voltage regulation
All of these
Increased transmission losses
High cost of equipment for a given load
Poor voltage regulation
All of these
Increased transmission losses
Answer
Download EE MCQ app
Economics of Power Generation
For a diesel generating station the useful life is expected to be around
75 to 100 years
50 to 75 years
15 to 20 years
20 to 50 years
75 to 100 years
50 to 75 years
15 to 20 years
20 to 50 years
Answer
Download EE MCQ app
Economics of Power Generation
Salvage value of the plant is always
Zero
Any of the listed here
Negative
Positive
Zero
Any of the listed here
Negative
Positive
Answer
Download EE MCQ app
Economics of Power Generation
Generating capacity connected to the busbars and ready to take load when switched on is known as
Spinning reserve
Hot reserve
Firm power
Cold reserve
Spinning reserve
Hot reserve
Firm power
Cold reserve
Answer
Download EE MCQ app
Economics of Power Generation
Depreciation charge are high in case of
Hydroelectric plant
Thermal plant
Diesel plant
Diesel plant
Hydroelectric plant
Thermal plant
Diesel plant
Diesel plant
Answer