EE MCQ
EE MCQ
Home
Quiz
Contact Us
Economics of Power Generation
Large capacity generators are invariably
Water cooled
Forced air cooled
Natural air cooled
Hydrogen cooled
Water cooled
Forced air cooled
Natural air cooled
Hydrogen cooled
Answer
Download EE MCQ app
Related Question
Economics of Power Generation
If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is
C/3
√3C
3C
C/√3
C/3
√3C
3C
C/√3
Answer
Download EE MCQ app
Economics of Power Generation
Is the reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order,
Firm power
Hot reserve
Spinning reserve
Cold reserve
Firm power
Hot reserve
Spinning reserve
Cold reserve
Answer
Download EE MCQ app
Economics of Power Generation
The connected load of a IVMIM uir consumer is around
80 kW
120 kW
5 kW
40 kV
80 kW
120 kW
5 kW
40 kV
Answer
Download EE MCQ app
Economics of Power Generation
The best location of p. f. Correction equipment to be installed on the transmission line is at the
Middle end
Receiving end
None of the listed here
Sending end
Middle end
Receiving end
None of the listed here
Sending end
Answer
Download EE MCQ app
Economics of Power Generation
For a large installation, it is better to apply
None of the listed here
Individual correction to small motors
Individual correction to large motors
Bulk correction to large motors
None of the listed here
Individual correction to small motors
Individual correction to large motors
Bulk correction to large motors
Answer
Download EE MCQ app
Search
Login here
Google
Download our application
Android
Apple
Follow Us
Facebook
Telegram
Instagram