In a power plant, a reserve generating capacity which is not in service but is in operation is known as
Cold reserve
Firm power
Spinning reserve
Hot reserve
Cold reserve
Firm power
Spinning reserve
Hot reserve
Answer
Download EE MCQ app
Related Question
DGVCL Exam Paper (11-12-2011)
If a relay fails to operate inspite of a fault in its own zone of protection, it is said to
Over reach
Pick up
Reach
Under reach
Over reach
Pick up
Reach
Under reach
Answer
Download EE MCQ app
DGVCL Exam Paper (11-12-2011)
In a series RLC circuit at resonance
Current is maximum and power factor is unity
Current is minimum and power factor is unity
Current is minimum and power factor is 0.5
Current is maximum and power factor is 0.5
Current is maximum and power factor is unity
Current is minimum and power factor is unity
Current is minimum and power factor is 0.5
Current is maximum and power factor is 0.5
Answer
Download EE MCQ app
DGVCL Exam Paper (11-12-2011)
The bus bar zone faults are generally
Phase to phase faults
Single line to ground faults
Double line to ground faults
Three phase short ciruits
Phase to phase faults
Single line to ground faults
Double line to ground faults
Three phase short ciruits
Answer
Download EE MCQ app
DGVCL Exam Paper (11-12-2011)
The best location of the power factor correction equipment to be installed in the transmission line is at
Any place
The receiving end
Middle of the line
The sending end
Any place
The receiving end
Middle of the line
The sending end
Answer
Download EE MCQ app
DGVCL Exam Paper (11-12-2011)
Kilobyte, megabyte and gigabyte are measuring units used in a computer. How many megabytes make one gigabyte?
1024
1042
1000
1204
1024
1042
1000
1204