Economics of Power Generation
Generating capacity connected to the bus bars and ready to take load when switched on is known as
firm power
cold reserve
hot reserve
spinning reserve
firm power
cold reserve
hot reserve
spinning reserve
Answer
Download EE MCQ app
Related Question
Economics of Power Generation
The area under load curve gives
Energy consumed
Maximum demand
Average demand
None of the listed here
Energy consumed
Maximum demand
Average demand
None of the listed here
Answer
Download EE MCQ app
Economics of Power Generation
For any type of consumer the ideal tariif is
Any of the listed here
Three part tariff
Two part tariff
Block rate tariff
Any of the listed here
Three part tariff
Two part tariff
Block rate tariff
Answer
Download EE MCQ app
Economics of Power Generation
If C is the capacitance per phase for delta connected capacitor bank, then capacitance per phase for star connected the capacitor bank is
√3C
3C
C/3
C/√3
√3C
3C
C/3
C/√3
Answer
Download EE MCQ app
Economics of Power Generation
For a power plant which of the following constitutes running cost?
Cost of lubricants
Cost of fuel
All of the listed here
Cost of wages
Cost of lubricants
Cost of fuel
All of the listed here
Cost of wages
Answer
Download EE MCQ app
Economics of Power Generation
Approximate estimation of power demand can be made by
Mathematical method
Statistical methods
Load survey method
All of the listed here
Mathematical method
Statistical methods
Load survey method
All of the listed here
Answer
Download EE MCQ app